Parking & pedestrian access
Concrete work at designated accessible parking spaces and pedestrian routes.
- Converted asphalt ADA-designated parking spaces to concrete.
- Replaced three sidewalk sections, each smaller than 35 square feet; two included tactile domes.
- Repaired or replaced approximately 33 linear feet of curbing across two sections.



